EU Regulation 1013/2006 — the legal foundation
Regulation (EC) 1013/2006 implements the Basel Convention and the OECD Decision on transboundary movement of waste within the EU. Non-hazardous metal scrap classified as 'green-list waste' (Basel Annex IX, e.g. B1010 for ferrous, B1020 for stainless, B1100 for copper) ships under simplified Annex VII documentation requirements when destined for OECD countries and selected non-OECD destinations.
Annex VII movement document
Every container of green-list scrap exported from the EU to a non-OECD destination ships with an Annex VII form. The form names the exporter (Nautica), importer (buyer), broker (if any), waste classification (Basel code), tonnage, destination port, and the contract under which the material moves. The original travels with the cargo; copies go to Dutch competent authority and to destination customs.
Basel Convention compliance
Non-hazardous green-list scrap (Basel Annex IX) moves under notification-free provisions to most destinations. Hazardous waste streams (e.g. unprepared insulated wire above defined PVC limits in some categories) require prior informed consent (PIC) and full Annex VA notification. Nautica trades exclusively in green-list grades and does not handle hazardous waste streams.
Destination-country import permits
India: Importers must hold a Hazardous Waste Authorisation (HWA) from MoEFCC where applicable, plus BIS registration and DGFT import licence. China: AQSIQ category-code permits, CCIC pre-shipment inspection. Turkey: TSE registration, import licence for certain ferrous categories. Bangladesh: Department of Environment NOC. UAE: Free zone or mainland import licence. Nautica verifies buyer permits before contract.
Rotterdam loading — the practical flow
Empty container picked up from depot → trucked to Nautica yard → floor-lined and dunnage placed → loaded under yard or inspector supervision → photo-documented → weight-verified at terminal-approved weighbridge → high-security bolt seal applied → trucked to terminal gate → ECT, APMT or RWG terminal acceptance → loaded on vessel per booking. Typical cycle: 3–7 days from container release to vessel cut-off.
Documentation pack — what ships with every container
Commercial invoice; detailed packing list; B/L (master and house if forwarder-routed); weight tickets (load port and terminal); EUR.1 origin certificate where applicable; Annex VII waste shipment movement document; insurance certificate (if Nautica-arranged CIF); inspection certificate (SGS, BV, Intertek, CCIC at buyer's option); XRF or chemistry analysis report. Indian buyers receive BIS-format docs; Chinese buyers CCIC-aligned; Turkish TSE-aligned.
Payment mechanics
Standard terms: 30% TT advance against signed PI / 70% LC at sight against scanned shipping documents. Alternative: 100% LC at sight against original docs. Buyer's bank confirms LC, Nautica ships, scanned docs go to buyer for verification, originals released against LC payment or TT confirmation. New buyers typically run 30:70 on first 3 contracts before extending to LC-only.
Freight market and transit times
Rotterdam → Nhava Sheva: 18–22 days, $80–250 freight per MT. Rotterdam → Mundra: 18–22 days. Rotterdam → Chittagong: 28–32 days. Rotterdam → Port Klang: 24–28 days. Rotterdam → Busan: 30–35 days. Rotterdam → Mersin: 12–14 days. Rotterdam → Jebel Ali: 16–20 days. Rotterdam → Houston: 14–18 days. Routings via Suez vs Cape of Good Hope add 7–10 days when Red Sea disruption applies.
Container types and stowage
20GP — workhorse for dense non-ferrous (22–24 MT) and HMS (~26 MT). 40HQ — high-cube for UBC bales (~40 MT), Tata extrusion. 40OT — open-top for oversized HMS plate. Break-bulk on combination carriers — for 5,000+ MT parcels of UBC or HMS. Choice depends on density, dimensional fit and buyer's discharge equipment.
How Nautica simplifies all of this
Buyers send one RFQ; Nautica handles the EU compliance paperwork (Annex VII, EUR.1), books the vessel via established forwarder contracts, arranges inspection per buyer's preference, applies seals, sends the full document pack to the buyer's bank under the agreed LC mechanism, and tracks the shipment to discharge. Single point of contact for the entire shipment lifecycle.